Stai visualizzando un contenuto segnaposto da Vimeo. Per accedere al contenuto effettivo, clicca sul pulsante sottostante. Si prega di notare che in questo modo si condividono i dati con provider di terze parti.

Ulteriori informazioni

SURGERY

Immediate implant placement and contour GBR using cerabone® +HyA and collprotect® membrane

This clinical video shows a post extractive implant placement for the replacement of a vertically fractured upper lateral incisor. An atraumatic extraction was performed by splitting the root in mesio-distal direction. The implant was placed 2 mm subcrestally and a stay-in abutment was connected according the one abutment-one time concept. A contour augmentation was performed using cerabone® +HyA and collprotect® membrane to simulate the root convexity. An immediate temporary screwed restauration was delivered. The tissues looked healthy and natural at four months and the final prosthesis was delivered.

Also interesting

Academy

0
Ambulatori
0
Webinar
0
Specialisti